Phase 1

Sewer Expansion Projects

Currently the Town is implementing Phase 1 (Years 0-10) of the Comprehensive Wastewater Management Plan (CWMP). Phase 1 consists of 18 individual sewer collection system projects, and additional sewer extensions, that will result in roughly 90 miles of new sewer infrastructure. Once complete, Phase 1 will remove approximately 44% of the nitrogen impacting our waters.

Scroll below for a detailed matrix of Phase 1 Project updates or utilize our Public CWMP Maps to locate your address and determine if/when your property may be recieving future sewer service as part of a sewer expansion project. 

Locate Your Property

Using the Public CWMP Map, search your address or parcel number to locate your property and determine if/when your property may be recieving future sewer service as part of a sewer expansion project. Scroll further down the page for additional detailed project status updates and links to important resources including public meeting recordings. 

 

Project Status & Construction Updates

View information related to each sewer expansion project included within Phase 1 of the CWMP. 

Phase 1 Progress

%

Completed Sewer Connections

There are currently 320+ properties available to connect to sewer as a result of the Town’s first two completed Phase 1 Sewer Expansion Projects. Of those eligible properties, 71% have completed their connection as of Spring 2026.

These projects are completed

Strawberry Hill Road Sewer Expansion
Route 28 East Sewer Expansion

Visit the project page at BarnstableWaterResources.com/28East

These projects are under construction or anticipated to begin construction soon

Centerville Village Sewer Expansion - North Phase
Route 28 West Sewer Expansion

Visit the project page at BarnstableWaterResources.com/28West

Phinney's Lane Neighborhoods Sewer Expansion
Centerville Village Sewer Expansion - South Phase

These projects are in development. Dedicated project pages will be created closer to construction.

Long Pond Area Sewer Expansion

Status: Design in Progress

Overview: This project will expand sewer to the south of Route 28, around Long Pond, Centerville.

In this area, existing on-site solutions to address wastewater needs negatively affect Long Pond. Additionally, this project will sewer Centerville Elementary School.

This project is anticipated to install approximately 9.7 miles of sewer.

Anticipated Construction Start: 2027

Anticipated Construction End: 2030

Anticipated Sewered Properties: 554

Anticipated Nitrogen Removal: 10.3 kg/day

Last Updated 06/25/2025

Old Yarmouth Road Sewer Expansion

Status: Preliminary Design in Progress

Overview: This project will expand sewer to the north of Route 28 and east of Yarmouth Road, providing sewer to businesses and residents along the following roads:

  • Old Yarmouth Road
  • Yarmouth Road
  • Joaquim Road
  • Bodick Road
  • Rosary Lane
  • Ferndoc Street
  • Route 28 from Cedar Street to Town Line

In this area, existing on-site solutions to address wastewater needs negatively impact economic development. Additionally, the Hyannis Water Syster Maher Drinking Water Wells, directly adjacent to the project area, have experienced contamination over the years.

This project is anticipated to install approximately 2.5 miles of sewer.

Anticipated Construction Begin: 2028

Anticipated Construction End: 2030

Anticipated Sewered Properties: 131

Anticipated Nitrogen Removal: 2.3 kg/day

Last updated 06/25/2025

Great Marsh Neighborhoods Sewer Expansion

Status: Design in Progress; Survey work scheduled within local neighborhoods Spring/Summer 2026.

Overview: This project will expand sewer to properties on Great Marsh Road, a portion of Shootflying Hill Road, and to the neighborhoods adjacent to those roads.

In this area, existing on-site solutions to address wastewater needs negatively affect Wequaquet Lake.

This project is anticipated to install approximately seven miles of sewer.

Anticipated Construction Start: 2028

Anticipated Construction End: 2031

Anticipated Sewered properties: 466

Anticipated Nitrogen Removal: 6.2 kg/day

Last updated 06/25/2026

Huckins Neck Sewer Expansion

Status: Design in Progress; Survey work scheduled within local neighborhoods Spring/Summer 2026.

Overview: This project will expand sewer to properties located on Huckins Neck, adjacent to Wequaquet Lake, Shallow Pond, and Bearse Pond.

In this area, existing on-site solutions to address wastewater needs negatively affect Lake Wequaquet, Shallow Pond, and Bearse Pond.

This project is anticipated to install approximately 2 miles of sewer.

Anticipated Construction Begin: 2029

Anticipated Construction End: 2031

Anticipated Sewered Properties: 147

Anticipated Nitrogen Removal: 2.1 kg/day

Last updated 06/25/2026

Prince Cove Sewer Expansion

In October 2024, the South County Road Sewer Expansion Project was integrated into the Prince Cove Sewer Expansion Project.

Status: Preliminary Design and Survey Anticipated in 2027

Overview: This project will expand sewer to properties on the north and east sides of Prince Cove.

This area has been identified as a needs area for nitrogen removal by Massachusetts Estuaries Project (MEP) modeling.

This project is anticipated to install approximately 7.5 miles of sewer.

Anticipated Construction Start: 2029

Anticipated Construction End: 2031

Anticipated Sewered Properties: 333

Anticipated Nitrogen Removal: 8.0 kg/day

Last Updated 06/25/2025

Long Beach Area Sewer Expansion

Status: Design in Progress

Overview: This project will expand sewer to properties near the following areas:

  • Craigville Beach
  • Long Beach
  • Short Beach
  • Lake Elizabeth

In this area, existing on-site solutions to address wastewater needs negatively affect Centerville River, Lake Elizabeth, Red Lily Pond, Craigville Beach, Covell’s Beach, and Long Beach. This project also includes the decommissioning of the existing shared septic system near Lake Elizabeth.

Anticipated Construction Start: 2030

Anticipated Construction End: 2032

Anticipated Sewered Properties: 227

Anticipated Nitrogen Removal: 3.6 kg/day

Last updated 06/25/2025

Old Craigville Road Sewer Expansion

Status: Preliminary Design in Progress

Overview: This project will expand sewer to properties located on Old Craigville Road and adjacent neighborhoods.

In this area, existing on-site solutions to address wastewater needs negatively affect Red Lily Pond and Lake Elizabeth. Additionally, the northern portions of the project area have been identified as needs area for nitrogen removal by Massachusetts Estuaries program (MEP) modeling as well as drinking water well protection (COMM Water Supply Wells).

This project is anticipated to install approximately 6.6 miles of sewer.

Anticipated Construction Start: 2030

Anticipated Construction End: 2032

Anticipated Sewered Properties: 440

Anticipated Nitrogen Removal: 4.9 kg/day

Last updated 06/25/2025

Osterville Woods Sewer Expansion

Status: Preliminary Design and Survey Anticipated in 2027

Overview: This project will expand sewer to properties in the Osterville Woods neighborhoods and adjacent areas.

The western portion of the project area has been identified as a needs area for nitrogen removal by Massachusetts Estuaries Program (MEP) modeling. The entire project ahs been identified as a needs area for drinking water well protection as the project area is located within the Zone II to COMM water supply wells.

This project is anticipated to install approximately 3.8 miles of sewer.

Anticipated Construction Start: 2030

Anticipated Construction End: 2032

Anticipated Sewered Properties: 253

Anticipated Nitrogen removal: 4.7 kg/day

Last updated 06/25/2025