Phase 1
Sewer Expansion Projects
Currently the Town is implementing Phase 1 (Years 0-10) of the Comprehensive Wastewater Management Plan (CWMP). Phase 1 consists of 18 individual sewer collection system projects, and additional sewer extensions, that will result in roughly 90 miles of new sewer infrastructure. Once complete, Phase 1 will remove approximately 44% of the nitrogen impacting our waters.
Scroll below for a detailed matrix of Phase 1 Project updates or utilize our Public CWMP Maps to locate your address and determine if/when your property may be recieving future sewer service as part of a sewer expansion project.
Locate Your Property
Using the Public CWMP Map, search your address or parcel number to locate your property and determine if/when your property may be recieving future sewer service as part of a sewer expansion project. Scroll further down the page for additional detailed project status updates and links to important resources including public meeting recordings.
Project Status & Construction Updates
View information related to each sewer expansion project included within Phase 1 of the CWMP.
Phase 1 Progress
%
Completed Sewer Connections
There are currently 320+ properties available to connect to sewer as a result of the Town’s first two completed Phase 1 Sewer Expansion Projects. Of those eligible properties, 71% have completed their connection as of Spring 2026.
These projects are completed
Strawberry Hill Road Sewer Expansion
Visit the project page at BarnstableWaterResources.com/StrawberryHill
Route 28 East Sewer Expansion
Visit the project page at BarnstableWaterResources.com/28East
These projects are under construction or anticipated to begin construction soon
Centerville Village Sewer Expansion - North Phase
Visit the project page at BarnstableWaterResources.com/CentervilleNorth
Route 28 West Sewer Expansion
Visit the project page at BarnstableWaterResources.com/28West
Phinney's Lane Neighborhoods Sewer Expansion
Visit the project page at BarnstableWaterResources.com/PhinneysNeighborhoods
Centerville Village Sewer Expansion - South Phase
Visit the project page at BarnstableWaterResources.com/CentervilleSouth
These projects are in development. Dedicated project pages will be created closer to construction.
Long Pond Area Sewer Expansion
Status: Design in Progress
Overview: This project will expand sewer to the south of Route 28, around Long Pond, Centerville.
In this area, existing on-site solutions to address wastewater needs negatively affect Long Pond. Additionally, this project will sewer Centerville Elementary School.
This project is anticipated to install approximately 9.7 miles of sewer.
Anticipated Construction Start: 2027
Anticipated Construction End: 2030
Anticipated Sewered Properties: 554
Anticipated Nitrogen Removal: 10.3 kg/day
Last Updated 06/25/2025
Old Yarmouth Road Sewer Expansion
Status: Preliminary Design in Progress
Overview: This project will expand sewer to the north of Route 28 and east of Yarmouth Road, providing sewer to businesses and residents along the following roads:
- Old Yarmouth Road
- Yarmouth Road
- Joaquim Road
- Bodick Road
- Rosary Lane
- Ferndoc Street
- Route 28 from Cedar Street to Town Line
In this area, existing on-site solutions to address wastewater needs negatively impact economic development. Additionally, the Hyannis Water Syster Maher Drinking Water Wells, directly adjacent to the project area, have experienced contamination over the years.
This project is anticipated to install approximately 2.5 miles of sewer.
Anticipated Construction Begin: 2028
Anticipated Construction End: 2030
Anticipated Sewered Properties: 131
Anticipated Nitrogen Removal: 2.3 kg/day
Last updated 06/25/2025
Great Marsh Neighborhoods Sewer Expansion
Status: Design in Progress; Survey work scheduled within local neighborhoods Spring/Summer 2026.
Overview: This project will expand sewer to properties on Great Marsh Road, a portion of Shootflying Hill Road, and to the neighborhoods adjacent to those roads.
In this area, existing on-site solutions to address wastewater needs negatively affect Wequaquet Lake.
This project is anticipated to install approximately seven miles of sewer.
Anticipated Construction Start: 2028
Anticipated Construction End: 2031
Anticipated Sewered properties: 466
Anticipated Nitrogen Removal: 6.2 kg/day
Last updated 06/25/2026
Huckins Neck Sewer Expansion
Status: Design in Progress; Survey work scheduled within local neighborhoods Spring/Summer 2026.
Overview: This project will expand sewer to properties located on Huckins Neck, adjacent to Wequaquet Lake, Shallow Pond, and Bearse Pond.
In this area, existing on-site solutions to address wastewater needs negatively affect Lake Wequaquet, Shallow Pond, and Bearse Pond.
This project is anticipated to install approximately 2 miles of sewer.
Anticipated Construction Begin: 2029
Anticipated Construction End: 2031
Anticipated Sewered Properties: 147
Anticipated Nitrogen Removal: 2.1 kg/day
Last updated 06/25/2026
Prince Cove Sewer Expansion
In October 2024, the South County Road Sewer Expansion Project was integrated into the Prince Cove Sewer Expansion Project.
Status: Preliminary Design and Survey Anticipated in 2027
Overview: This project will expand sewer to properties on the north and east sides of Prince Cove.
This area has been identified as a needs area for nitrogen removal by Massachusetts Estuaries Project (MEP) modeling.
This project is anticipated to install approximately 7.5 miles of sewer.
Anticipated Construction Start: 2029
Anticipated Construction End: 2031
Anticipated Sewered Properties: 333
Anticipated Nitrogen Removal: 8.0 kg/day
Last Updated 06/25/2025
Long Beach Area Sewer Expansion
Status: Design in Progress
Overview: This project will expand sewer to properties near the following areas:
- Craigville Beach
- Long Beach
- Short Beach
- Lake Elizabeth
In this area, existing on-site solutions to address wastewater needs negatively affect Centerville River, Lake Elizabeth, Red Lily Pond, Craigville Beach, Covell’s Beach, and Long Beach. This project also includes the decommissioning of the existing shared septic system near Lake Elizabeth.
Anticipated Construction Start: 2030
Anticipated Construction End: 2032
Anticipated Sewered Properties: 227
Anticipated Nitrogen Removal: 3.6 kg/day
Last updated 06/25/2025
Old Craigville Road Sewer Expansion
Status: Preliminary Design in Progress
Overview: This project will expand sewer to properties located on Old Craigville Road and adjacent neighborhoods.
In this area, existing on-site solutions to address wastewater needs negatively affect Red Lily Pond and Lake Elizabeth. Additionally, the northern portions of the project area have been identified as needs area for nitrogen removal by Massachusetts Estuaries program (MEP) modeling as well as drinking water well protection (COMM Water Supply Wells).
This project is anticipated to install approximately 6.6 miles of sewer.
Anticipated Construction Start: 2030
Anticipated Construction End: 2032
Anticipated Sewered Properties: 440
Anticipated Nitrogen Removal: 4.9 kg/day
Last updated 06/25/2025
Osterville Woods Sewer Expansion
Status: Preliminary Design and Survey Anticipated in 2027
Overview: This project will expand sewer to properties in the Osterville Woods neighborhoods and adjacent areas.
The western portion of the project area has been identified as a needs area for nitrogen removal by Massachusetts Estuaries Program (MEP) modeling. The entire project ahs been identified as a needs area for drinking water well protection as the project area is located within the Zone II to COMM water supply wells.
This project is anticipated to install approximately 3.8 miles of sewer.
Anticipated Construction Start: 2030
Anticipated Construction End: 2032
Anticipated Sewered Properties: 253
Anticipated Nitrogen removal: 4.7 kg/day
Last updated 06/25/2025
Latest Sewer Construction News
VIDEO: Phinney’s Lane Neighborhoods Sewer Expansion Project Public Informational Meeting (Construction) – Recap
The Town of Barnstable Department of Public Works hosted a Public Informational Meeting on Wednesday, October 7, 2026 at Barnstable High School's Knight Auditorium to discuss upcoming sewer construction for the Phinney's Lane Neighborhoods Sewer Expansion Project....
Notice of Informational Meeting: Phinney’s Lane Neighborhoods Sewer Expansion Project
The Town of Barnstable invites interested individuals to attend an informational meeting to discuss sewer construction plans for the Phinney’s Lane Neighborhoods Sewer Expansion Project. This project will: Remove nitrogen from the Centerville River Watershed, helping...
Sewer Construction on North Street, Hyannis
Beginning Monday, September 21, 2026, a contractor working for the Town of Barnstable, CC Construction, is scheduled to begin sewer construction on North Street in Hyannis. Work will take place 7:00 AM to 4:00 PM, Monday to Friday, weather permitting. Work is...