Vineyard Wind, through their contract Terracon, will be conducting sixteen (16) additional shallow borings in the roadways along the proposed route for the connector 2 project. The tentative schedule is planned as follows, subject to change with production rates and traffic control set ups and break downs: 9/27- B106,107,108 and 109; 9/28- B110,111,112 and 113; 9/29- B115,116,117 and 119; 9/30- B120,121,123 and 124.
Locations can be found on the map at HERE
Typical work hours will be Monday through Friday, 7:00 am to 4:00 pm, though work during weekends may be necessary. Traffic will be impacted as a result of the lane closures and residents are encouraged to plan accordingly when traveling in this area. As always, please slow down and use extreme caution when traveling through or near construction areas, and follow posted safety signs.