WaterResources@town.barnstable.ma.us
  • Facebook
  • Twitter
  • Instagram
  • Facebook
  • Twitter
  • Instagram
  • NEWS & UPDATES
  • LIBRARY
    • Glossary
    • Documents
    • Video Archive
    • Maps
  • CONTACT
    • Request Presentation
Barnstable Water Resources
  • WASTEWATER PLAN
  • PHASE I PROJECTS
  • SEWER CONNECTION
  • ANTICIPATED COSTS
  • WATER QUALITY MONITORING
  • FAQ’s
  • LEARN MORE
    • Aquaculture
    • Beaches
    • Dredging
    • Ponds & Lakes
    • Private Septic Systems
    • Stormwater
    • Sewer Collection & Treatment
      • Pump Stations
    • Water Districts & Systems
    • Watersheds
Select Page

16. How do the new Watershed Permit Regulations and revised Title 5 septic system regulations impact me?

Dec 22, 2022

The Town of Barnstable received the final Watershed Permit Regulations (314 CMR 21.00), and Title 5 Natural Resource Nitrogen Sensitive Area Regulations (“NSA”) (310 CMR 15.214 and 15.215), on Thursday, June 22, 2023, and is in the process of completing a...

11. What happens to my septic system when I connect to sewer service?

Apr 8, 2021

The de-commissioning and/or removal or filling of septic systems will be determined on a property- by-property basis. This determination will be made at the time the property is being connected to the sewer system.

Subscribe

CWMP eNews

Subscribe for information on Wastewater and Water Quality projects in the Town of Barnstable.

 

You have Successfully Subscribed!

NEWS & UPDATES

  • August 29, 2023 | Pet Advisory – Long Pond, Marstons Mills
  • Fall Construction Season Resumes September 5, 2023
  • Craigville Beach – Article 97 Alternatives Analysis
  • August 22, 2023 | Water Quality Advisories – Ponds & Lakes
  • August 8, 2023 | Water Quality Advisories – Ponds & Lakes

Categories

  • Beach Water Quality Updates
  • CWMP Updates
  • cyanobacteria
  • Drinking Water
  • Fresh Water Ponds & Lakes
  • MS4
  • News & Updates
  • PFAS
  • Septic Systems

STAY UPDATED

CWMP eNews

Subscribe for information on Wastewater and Water Quality projects in the Town of Barnstable.

 

You have Successfully Subscribed!

Resources

  • Cape Cod Commission Section 208 Plan
  • 208 Implementation Reports
  • Cape Cod and Islands Water Protection Fund
  • Massachusetts Estuary Project (MEP)
  • Total Maximum Daily Loads by Watershed
  • Massachusetts Department of Environmental Protection (MassDEP)
  • Septic Systems & Title 5
  • Association to Preserve Cape Cod (APCC)
  • United States Environmental Protection Agency

Quick Links

  • Home
  • Comprehensive Wastewater Management Plan
  • Phase 1 Projects
  • Property Look-Up Tool
  • Property Owner Costs
  • Sewer Service Connection
  • Frequently Asked Questions
  • Water Quality Monitoring
  • News & Updates
  • Water Quality Management Resources
  • Contact Us
  • Facebook
  • Twitter
  • Instagram

Designed by Elegant Themes | Powered by WordPress