WaterResources@town.barnstable.ma.us
  • Facebook
  • Instagram
  • Facebook
  • Instagram
  • BEACH STATUS UPDATES
  • TRAFFIC ADVISORIES
  • NEWS
  • ABOUT
    • CONNECT
    • SUBSCRIBE
    • LEARN MORE
      • Glossary
      • Video Library
      • Watershed Maps
Barnstable Water Resources
  • PROGRAMS & PROJECTS
    • CWMP
    • Sewer Expansion Projects
    • Alternative Technology
    • CWMP Ad Hoc Committee
  • SEWER CONNECTION
    • Connection Process
    • Anticipated Costs
    • Financial Resources
    • For Contractors
  • WATER QUALITY MONITORING
    • Embayment Monitoring
    • Freshwater Ponds & Lakes Monitoring
    • Cyanobacteria Monitoring
  • DRINKING WATER
  • COASTAL RESILIENCY
  • FAQs
  • REPORTS & DOCUMENTS
Select Page

15. Why is the sewer assessment not based on the number of buildings on the lot? One building could have multiple dwelling units within it and may only require one sewer connection.

Apr 8, 2021

The sewer assessments are determined using either a fixed uniform rate or a rate based upon a uniform unit method. A fixed uniform rate shall be based upon the estimated average cost of all the sewers therein, according to the frontage of such land on any way in which...

NEWS & UPDATES

  • Planned Roadway and Sewer Construction in the Area of Mother’s Park, Centerville
  • Route 28 West Sewer Expansion Project Public Information Meeting Recap
  • Construction Update: Relocation of Sandy Neck Beach Gatehouse to Begin November 12
  • Public Roads Improvement Program: Paving Locations to Include Hyannis, Marstons Mills, and Osterville
  • Town of Barnstable Breaks Ground on New Straightway Water Treatment Facility

Categories

  • Beach Water Quality Updates
  • Blog
  • CWMP Updates
  • Cyanobacteria
  • Drinking Water
  • E. coli
  • Fresh Water Ponds & Lakes
  • MS4
  • News & Updates
  • PFAS
  • Press Releases
  • Septic Systems
  • Sewer Construction
  • Stormwater
  • Traffic Advisories
  • Wastewater Treatment Plant
  • Water Quality

Resources

  • Cape Cod Commission Section 208 Plan
  • 208 Implementation Reports
  • Cape Cod and Islands Water Protection Fund
  • Massachusetts Estuary Project (MEP)
  • Total Maximum Daily Loads by Watershed
  • Massachusetts Department of Environmental Protection (MassDEP)
  • Septic Systems & Title 5
  • Barnstable Clean Water Coalition
  • Association to Preserve Cape Cod (APCC)
  • United States Environmental Protection Agency

Quick Links

  • Comprehensive Wastewater Management Plan
  • Phase 1 Sewer Expansion Projects
  • Alternative Technology
  • CWMP Ad Hoc Committee
  • CWMP Property Look-Up Map
  • Sewer Connection
  • Property Owner Costs
  • Financial Resources
  • Contractor Information
  • Water Quality Monitoring
  • Drinking Water
  • Coastal Resiliency Projects
  • Frequently Asked Questions
  • Newsroom
  • Reports & Documents
  • Beach Status Updates
  • Traffic Advisories
  • Learn More
  • Contact Us
  • Facebook
  • Instagram

Designed by Elegant Themes | Powered by WordPress