The proposed project would utilize an existing footprint of the Marstons Mills Wastewater Treatment Plant (MMWWTP) and convert it to a municipal wastewater pump station. This station would be designed to sewer the nearby properties and accommodate future sewering needs in the area. An intermediate pump station would also be included along Route 28 to convey the wastewater along Route 28 from this converted pump station to the aforementioned pump station at the intersection of Route 28 and Phinney’s Lane which will convey flows to WPCF.
Subscribe
CWMP eNews
Subscribe for information on Wastewater and Water Quality projects in the Town of Barnstable.